|
Building Age : New Construction
Foundation : Engineered Micro pile System
Frame : Structural concrete columns with Filigree wide slab floor system and roof.
Exterior Walls : "Trespa Meteon" exterior panel system
Roof : Concrete deck with tapered insulation and EPDM roof.
Interior Walls : Painted drywall over metal studs.
Floors : Hardwood and Stone
HVAC : Individual 2 zone central air and gas fired heating system.
Electric : PECO
Gas : Philadelphia Gas Works
Life/Safety : 100% Sprinkled with three individual stair towers for egress.
Plumbing : Copper water supply with cast iron sewer and drainage.
|